The optimal number of yard cranes in container terminal

Authors

1 Assistant Professor, Department of Computer Engineering, Postgraduate Engineering Center, Islamic Azad University, South Tehran Branch, Tehran, Iran

2 Research Scholar, Department of Transportation Engineering, Islamic Azad University, Science and Research Branch, Tehran, Iran

Abstract

The aim of this study is to propose a new mixed integer linear programming (MILP) model to find the minimum required number of yard cranes, Rubber tyred gantry cranes (RTGCs), for completion the total amount of works at the end of planning horizon. In other word, we find the optimal number of yard cranes in a container terminal which completes the total amount of works. The paper supports the proposed method using a numerical example.

Keywords